Recent Projects

Airly Coal Mine Project

Airly Coal Mine

Solar Panels Project – Access roads, culverts and drainage, hardstand areas and building pads, trenched and installed over 5km of electrical conduit.

Thompsons Creek Dam Project

Thompsons Creek Dam

Erosion Protection – Stabilization of the subgrade, laying of geotextile membrane with four different layers of rock materials with different staging.

Thompsons Creek Dam Project

Thompsons Creek Dam

Pipeline Project – Completed within a tight timeframe to coincide with low water levels during construction and budget requirements.

Airly Coal Mine Solar Panels Project

Started with a Rural paddock adjacent to the mine site, Dukes constructed the access roads, installed culverts and drainage, hardstand areas and building pads, trenched and installed over 5 km of electrical conduit ranging in sizes from 50mm to 200mm. With each conduit having an exact location for its termination, this was achieved by using our GPS locating field rover. The project was delivered on time and within budget. View the Gallery

Thompsons Creek Dam Erosion Protection

This project was quite extensive with the stabilization of the subgrade laying of the geotextile with four different layers of rock materials from a small 50mm base up to a large 900mm Rock aggregate along with different staging of layers of material. With a tight timeframe having the dam at a lower water level for the construction. Dukes Earthmoving were able to deliver this project on time and within budget. View the Gallery

Our latest sub-division, Bowen Vista, South Bowenfels

Other Projects

  • Lake Lyell upgrade
  • Bulahdelah/Pacific Highway upgrade
  • Austin’s Hard Rock Quarry
  • Lithgow Water Base Hockey Complex Turfs 1 & 2
  • Western Main Washing Plant up- grade Civil Works
  • Cadia Gold Mine
  • Invincible Colliery Open Cut Coal Mine
  • Orange Treatment Plant upgrade Civil
  • Hargraves Gold Mine Blayney Tailings Dams 3 & 4
  • Grain Silos Civils Graincorp
  • Lithgow Hospital Civil works
  • Treeview Estate Retirement Village
  • Spring Creek Dam Upgrade Projects
  • Springvale Colliery – Onsite Batch Plant
  • Homebush Bay Olympic Site – Civil
  • Gongues Wallerawang Treatment Works Upgrade
  • Centennial Coal Water Transfer Project
  • Wallerawang and Mt Piper Ash Repository’s
  • Pinedale Open Cut Coal Mine
  • Centennial Coal – Castlereagh Highway turning lane
  • Walker Quarries Highway Intersection and Quarry development.
  • Toukley, Orange and Lithgow 7/11 Civil Earth Works
  • Mt Piper Water Transfer civil works
  • Airly Mine – 2MW solar Project, Civil Earth Works
  • Bowen Vista Sub Division, Bowenfels
  • Energy Australia – Thompson Creek Dam Erosion Protection Control
  • Energy Australia – Thompson Creek Dam Pipeline
  • Springfield Sub Division – Oberon
  • Centennial Coal Clarence – Geological explorative civil works
  • Lithgow Workmen’s Club Motel Civil Works
  • Lithgow City Council – Road Repairs & Improvement Program
  • Emirates Resort Wolgan Valley on Site Civil Upgrades
  • Zinfragroup – Upgrade External Voltage Lines, Wallerawang Sub Station
  • John Holland Group Wallerawang Sub Station Earthworks & Conduits, Cable Trays, Access Roads